Home » Products » Water Filling Machine » CGF8-8-3 Mineral Water Bottling Machine (2000-3000BPH)
Share to:

CGF8-8-3 Mineral Water Bottling Machine (2000-3000BPH)

Material: SUS304/SUS316,
Capacity: 2000-3000 bottles/hr for 500ml
Min Order: 1 set
Specially designed according to customer's bottles and caps.

  • CGF8-8-3
  • 8422301090

The CGF8-8-3 Mineral Water Bottling Machine combined water bottle washing, filling and capping into 3 in 1 monoblock. It is suitable for both plastic polyester bottle (PET bottle) and glass bottle with screw caps for non-aerated carbon dioxide drinks such as mineral water, pure water, non-gas water, spring water and so on. The water filling machine design could shorten the time for the drink material contact with outside, increase the sanitation condition throught economy benefit.

The machine adopts advanced Simens PLC and touch screen to ensure stable running. The empty bottles adopt air conveyor transfering to the 3 in 1 machine, and output bottles adopt flat conveyor with inverter to make sure the water filling machine speed adjustable. 

water bottling machinery factory.jpg


* Easy operation and maintenance;

* Advanced Siemens PLC and touch screen;

* Gravity Filling with high capacity;

* Italy technology capping more precision.

* Belt type cap uploader with new tehnolgy avoid cap blocking.

Technical Parameters:



Rinsing heads


Filling heads


Capping heads


Capacity based   on 500ml PET bottle


Suitable   bottle height (mm)


Suitable   bottle diameter (mm)


Compressed   air pressure


Washing Water   pressure (Mpa)


Motor   Power






water bottling machine process.jpg

Maintenance of automatic water filling machine:

Every shift of production shall carry out an overall clean of machine and the inspection of the fixing parts to ensure no looseness either at beginning or at the end.

If the meshing of gears is not satisfactory the remedy work shall be carried out and lubricate the gears with grease at last.

When the seasonal production is finished or any temporal stop of production happens in a year, an overhaul shall be carried out and the wearing-and-tearing parts should be replaced ensuring the satisfactory production of next term.


1) When cleaning, forbid any water spray over rotating or electrical parts;

2) Bottles and caps shall accord with technical requirement and any discord ones shall be forbidden to be applied lest causing mechanical failure;

3) Each interconnecting of drive-and-driven pairs shall be precisely adjusted lest any bottle-blocking will occur;

4) Regular inspection of lubrication spots and ensuring satisfactory lubrication.


Leyu Economic Development Zone, Zhangjiagang City, Jiangsu Province, China

Call Now

+86-135 8442 6116
+86-512-5868 2331
© 2017  Zhangjiagang Borun Machinery Co., Ltd   All rights reserved.     Site Map     Designed by iwonder.cn